Cart

Your shopping cart is currently empty

  1. Home
  2. Patterns
  3. Edith shawl Novita Venla
Edith shawl Novita Venla Example 1Edith shawl Novita Venla Example 1
Intermediate

Edith shawl Novita Venla

This shawl is part of a capsule wardrobe designed by Sari Nordlund, comprising nine designs perfectly compatible with each other.

Size(s)

one size

Yarn demand

Novita Venla (606) Sandy Beach 300 g

Needles and other supplies

Needles Novita 4 mm (UK 8 / US 6) or size needed for gauge; cable needle

Designer

Sari Nordlund

Finished dimensions

Size Approx. 150 cm x 100 cm / 59 in x 39 in

Stitch pattern
- Garter stitch: knit all rows.
- Cable pattern: work following the chart and instructions.

Gauge
26 sts and 32 rows in cable pattern with larger needles = 10 cm / 4 in

Cast on 3 sts and knit 1 row (WS).

Row 1 (RS): kfb (= knit front and back), kfb, k1 = 5 sts.

Row 2 (WS): knit all sts.

Row 3: kfb, k2, kfb, k1 = 7 sts.

Row 4: k3, place marker, k1, place marker, k3.

Row 5: work 3 sts in garter st, slip marker, increase 1 st (= knit the strand of yarn between the sts through the back loop), p1, slip marker, work 3 sts in garter st = 8 sts.

Row 6: work garter st to marker, slip marker, k1, p1, slip marker, work garter st to end of row.

Row 7: work garter st to marker, slip marker, work row 1 of chart I (= 2 sts + 1 st), slip marker, work garter st to end = 9 sts.

Keep working 3 sts at both ends in garter st. Between the markers work rows 2-60 of chart I. 41 sts now on the needles.

Keep working 3 sts at both ends in garter st. Work 2 sts at the right end of the cable section following row 1 of chart I (= 2 sts + 1 st) and the other 33 sts following row 1 of chart II. Work rows 2-60 of chart I. Work rows 2-20 of chart II and then repeat rows 1-20 two more times (= 60 rows: three repeats of chart II per each repeat of chart I). 74 sts now on the needles.

Repeat rows 1-60 of chart I 6 more times. 33 sts increased each time. Always work the 33 new sts following the 33 st pattern in chart II.

Work rows 1-60 of chart I 8 times in total. 272 sts now on the needles.

With all sts, work garter st for 6 rows. Bind off loosely.

Finishing

Wet-block to measurements.

Securely weave in all ends. Make approx. 13 cm long tassels for the corners.

Similar instructions

See all
Novita Essentials: Zaza Scarf

Novita Essentials: Zaza Scarf

Novita Essentials: Fiona Scarf

Novita Essentials: Fiona Scarf

Novita Huviretki: Nesna shawl

Novita Huviretki: Nesna shawl

Novita Woolly Wood: Iltaruskon aikaan (At Sunset) shawl

Novita Woolly Wood: Iltaruskon aikaan (At Sunset) shawl

Please select your shipping country to display the correct pricing and available shipping methods.

Finland EUR €
Sweden SEK
EU EUR €