Signature yarns now available!
View Shipping countries

Cart

Your shopping cart is currently empty

  1. Home
  2. Patterns
  3. Kaamos KAL, Kaamos Office
Kaamos KAL, Kaamos Office Example 1Kaamos KAL, Kaamos Office Example 2Kaamos KAL, Kaamos Office Example 3Kaamos KAL, Kaamos Office Example 4Kaamos KAL, Kaamos Office Example 5Kaamos KAL, Kaamos Office Example 6Kaamos KAL, Kaamos Office Example 7

Kaamos KAL, Kaamos Office

Kaamos Office is a modern knit sweater designed for urban wear. The wide sleeves and open V-neck make this sweater perfect for indoor wear. The vest, knitted using the same pattern, pairs beautifully with a collared shirt. Choose your favorite color from Hygge Chunky's gorgeous color chart and knit your go-to sweater for years to come.

Designer

Piia Maria Pekkanen

Gauge 19 sts and 21 rows in cable pattern (blocked) = 10 cm x 10 cm / 4 in x 4 in

Stitch patterns Cable pattern (flat and in the round):follow the chart and instructions. Stockinette stitch in the round: knit all rounds.

Note The sweater is knitted seamlessly from neckline to hem.In the sweater version, the stitches for the top-down sleeves are picked up from the armholes.The garment is finished with a neck border and armhole borders (slipover version only).

Abbreviations and techniques

st(s) = stitch(es)

k = knit stitch

p = purl stitch

RS = right side

WS = wrong side

*–* = repeat section as instructed

M1R = make one right: pick up the strand of yarn between the sts onto the left needle from the back and knit it through the front loop.

M1L = make one left: pick up the strand of yarn between the sts onto the left needle from the front and knit it through the back loop.

M1RP = make one right purl: pick up the strand of yarn between the sts onto the left needle from the back and purl it through the front loop.

M1LP = make one left purl: pick up the strand of yarn between the sts onto the left needle from the front and purl it through the back loop.

sk2p = slip 1 knitwise, k2tog, pass the slipped st over.

1

Part 1

Days 1, 2 and 3. Work 7–17 rows each day.

Back

Using the larger needle, cast on 41 sts for the neckline.Begin the cable pattern on row 1 of chart I (WS).

2

Row 1 (WS): p10, k1, p9, k1, p9, k1, p10.

Begin increases at the shoulder:

Row 2 (RS): k2, PM (place marker), M1L, k3, right-leaning cable (slip 2 sts onto cable needle and hold in back, k3, k2 from cable needle), p1, left-leaning cable (slip 3 sts onto cable needle and hold in front, k2, k3 from cable needle), k4, p1, k4, right-leaning cable, p1, left-leaning cable, k3, M1R, PM, k2 = 43 sts.

Row 3 (WS): p2, SM (slip marker), M1RP, p9, k1, p9, k1, p9, k1, p9, M1LP, SM, p2 = 45 sts.

Row 4 (RS): k2, SM, M1L, p1, k2, right-leaning cable, k2, p1, k2, left-leaning cable, k2, p1, k2, right-leaning cable, k2, p1, k2, left-leaning cable, k2, p1, M1R, SM, k2 = 47 sts.

You have now worked rows 1–4 of chart I.Work following the chart, increasing 1 st at both ends (2 sts from the edge) on each row.Work the increased sts following the cable pattern.When you have the 9 sts for the next cable at the edge of the piece, work the cables on the same rows as before but in the opposite direction compared to the adjacent cable.Always p1 between the cables (= k1 on WS rows).Repeat the increases 21(21)31(31)41(41)51(51) times in total. Finish after a RS row.83(83)103(103)123(123)143(143) sts now on the needles, 2(2)3(3)4(4)5(5) cables at the slanted edge + 2 edge sts.

3

Days 4 and 5. Work 12–14 rows each day.

Place removable markers (shoulder markers) at both ends of the piece (on last row worked).Resume the cable pattern on row 7(7)1(1)3(3)5(5) of chart II (WS).Work the 2 sts at the left end, repeat the 20 st pattern 4(4)5(5)6(6)7(7) times, work the st at the right end.Keep working the cable pattern until you have repeated the 8-row pattern 6(6)7(7)9(9)10(10) times in total after the cast-on edge. Finish after row 8.The next row is a WS row.

4

Day 6. Work 11 rows.

Sizes XS/S(L)XXL(4XL): work cable pattern for 11 more rows.The last row is a RS row.

Sizes M(XL)3XL(5XL): Work the WS row, then begin increases for the armhole: p1, M1R, work cable pattern to last st, M1L, p1.Repeat the increases on every other row 5 times in total. Finish after a RS row.10 sts increased.

83(93)103(113)123(133)143(153) sts in the back.

5

Day 7

Take the day off.

6

Part 2

Days 1, 2 and 3. Work 30–32 rows each day.

Right front

With RS facing and the cast-on edge up,pick up and knit sts from the slanted section of the right back shoulder.Begin at the shoulder marker and go towards the neck, picking up 1 st from each row. The outermost shoulder st is a selvedge st.Pick up 23(23)33(33)43(43)53(53) sts in total.

7

Begin the cable pattern on row 1 of chart III: (WS) work 11 sts, place marker, work as instructed for your size, work the edge st.Work rows 2–3. On row 4, begin increases: work to marker, M1R, slip marker, work 11 sts.Repeat the increases 4 times on every 4th row and then 15 times on every other row = 43(43)53(53)63(63)73(73) sts. Note: When you have enough sts for the next cable, work the cables on the same rows as before but in the opposite direction compared to the adjacent cable.Finish the chart.The last row is a WS row.Leave the sts on hold but do not break yarn.

8

Left front

Join a new ball of yarn and use the larger needles. With RS facing and the cast-on edge up,pick up and knit sts from the slanted section of the left back shoulder.Begin at the neck edge and go toward the shoulder marker.Pick up 1 st from each row. The outermost shoulder st is a selvedge st.Pick up 23(23)33(33)43(43)53(53) sts in total.

9

Begin the cable pattern on row 1 of chart IV:(WS) work the edge st, work as shown for your size until 11 sts remain, place marker (PM), work 11 sts.Work rows 2–3. On row 4, begin increases: work 11 sts, SM, M1L, work to end.Repeat the increases 4 times on every 4th row and then 15 times on every other row = 43(43)53(53)63(63)73(73) sts. Note: When you have enough sts for the next cable, work the cables on the same rows as before but in the opposite direction compared to the adjacent cable.Finish the chart.The last row is a WS row.Break yarn.

10

Days 4, 5 and 6. Work 15–17 rows each day.

Front

Place the sts of both front pieces onto the same needle.Work the cable pattern until 3 sts remain in the right front.Skp, p2tog (last st + first st of left front).K2tog, work cable pattern to end of row = 83(83)103(103)123(123)143(143) sts.Keep working the cable pattern until you have repeated the 8-row pattern 8(8)9(9)10(10)11(11) times in total after the pick-up edge. Finish after row 8.The next row is a WS row. Note: The front is significantly longer than the back at the armhole edge.

11

Sizes XS/S(L)XXL(4XL): work cable pattern for 11 more rows.The last row is a RS row.

Sizes M(XL)3XL(5XL): work the WS row, then begin increases for the armhole: p1, M1R, work cable pattern to last st, M1L, p1.Repeat the increases on every other row 5 times in total. Finish after a RS row.10 sts increased.

83(93)103(113)123(133)143(153) sts in the front.Leave the sts on hold.

12

Day 7.

Take the day off.

Similar patterns

See all
Mantra Vest
Buy

Mantra Vest

Solju Sweater
Buy

Solju Sweater

Kaamos KAL, Kaamos Outdoor
Free

Kaamos KAL, Kaamos Outdoor

Kaamos KAL, Kaamos Cottage
Free

Kaamos KAL, Kaamos Cottage

Please select your shipping country to display the correct pricing and available shipping methods.

Finland EUR €
Sweden SEK
EU EUR €